Loading...
HomeMy WebLinkAboutContract 1555-2 IA JUL 3 0 2014 DANIEL'S DKI DAN 1 EL.'S 73950 DINAH bRIVE,SUITE 302 Dig #: 14-0651-STR DESER PALM DESENT:CA92211 'i`:9� TEL 760-320-2128 FAX 760-324-1714 WATER LICENSE#581149 C / � CHANGE ORDER # 1 S rC� d� // Customer(s): City of Cathedral City Date: 07/29/2014 Address: 27610 Landau Blvd City/State/Zip: Cathedral City, CA 92234 1. Description of Changes in Work, Materials and/or Equipment Installed. Pursuant to the terms and conditions of the Agreement dated 06/03/2014 , Customer authorizes and requests the change(s) in the Work specified below. The Agreement and/or scope of work is hereby changed as follows(continue on separate sheets, if necessary): See Estimate 14-0651-STR-CO#1 (Dated 07/22/14)for details 2. List of Documents Incorporated into this Change Order: Estimate 13-1293-CHGORDI 3. Change in Contract Price. As a result of the changes described above, the amount payable to Contractor is hereby modified as follows. This Change Order shall: ❑ Increase the cost of the work by $ 29,875.00 ❑ Decrease the cost of the work by $ Total Revised Contract Price: $ 35,943.14 4. Progress Payments. Changes, if any, in progress payments: ❑None; ❑ As follows: 1.$4,979.00 Upon signing Change Order 4. $4,979.00 Upon 60%completion of work 2. $4,979.00 Upon 20%completion of work 5. $4,979.00 Upon 80%completion of work 3. $4,979.00 Upon 40%completion of work 6. $4,980.00 Upon completion of work under contract 5. Completion. As a result of the changes described above, the approximate days for substantial completion of the Work is hereby modified as follows(if applicable): Estimated completion date 08/29/2014 6. Note About Extra Work and Change Orders: Extra Work and Change Orders become part of the contract once the order is prepared in writing and signed by the parties prior to the commencement of any work covered by the new change order. The order must describe the scope of the extra work or change, the cost to be added or subtracted from the contract, and the effect the order will have on the schedule of any progress payments. 7. Terms. This Change Order supersedes any contrary terms and provisions in prior agreements. All other applicable terms and conditions of the written agreements between the parties shall be unaltered by this Change Order and shall remain in full force and effect. I HAVE READ THIS CHANGE ORDER AND I UNDERSTAND IT. I ALSO UNDERSTAND I AM ENTITLED TO A COMPLETELY FILLED-IN COPY OF THIS CHANGE ORDER, SIGNED BY BOTH ME AND THE CONTRACTOR,BEFORE CHANGE ORDER WORK MAY BE STARTED. "Customer( ' CONTRACTOR _ Signature; Check one: Customer; ❑Customer's Agent Signature IN M Jh m i r S.,7 Am...:4 " . c.. �. Print Name and Title Print Name,and Job Title DAN IEL.'S ESTIMATE / 1 • WATER DATE: 7/22/2014 Estimate#: 14-0651-STR-CO#1 Estimate for Change Order 1, Copy 2, Page 1 SERVICE PROVIDER CUSTOMER Daniel's DKI Cathedral City Fire Department-Station 413 73950 Dinah Shore Drive, Ste. 302 27160 Landau Blvd. Palm Desert, CA 92211 Cathedral City, CA. 92234 Phone: (760)320-2128 Fax: (760) 324-1714 restorenow(p�danielsdki.com PROJECT DESCRIPTION: Tile work for mens and womens restrooms including showers and floors, installing additional floor drains and replacing shower doors. ID DESCRIPTION Qty Amount,$ TOTAL 1 Tile-Remove&replace tile floors&covebase up walls to 1 12,213 $ 12,212.60 fourth row of wall tile,including disposal fees,water proofing subfloor&improving leveling/drainage toward floor drains. (Mens) 2'Tile-Remove&replace tile shower floors&covebase up walls 1 4,522.12 $ 4,522.12 to fourth row of wall tiles, including disposal fees, waterproofing&shower pans(Mens) 3 Tile-Remove&replace tile shower floor&covebase up walls 1 2054.45 $ 2,054.45 to fourth row of wall tiles, including disposal fees, waterproofing&shower pans(Womens) DANIEL'S ESTIMATE zn. DATE: 7/22/2014 WATlR Estimate#: 14-0651-STR-CO#1 Estimate for Change Order 1 Copy 2, Page 2 ID DESCRIPTION Qty Amount,$ TOTAL 4 Tile-Remove&replace tile floor&covebase up walls to 1 3,270 $ 3,269.77 fourth row of wall tile,including disposal fees,water proofing subfloor&improving leveling/drainage toward floor drain. (Womens) 5 Shower doors-Remove&replace shower doors with new. 1 3968.06 $ 3,968.06 Includes removal of old doors&tracks,disposal fees, new materials and labor to install. (Mens&Womens) 6 Plumbing_ 1 3848 $ 3,848.00 2 new floor drains centered in front of showers, abandon 1 pre-existing drain&1 new drain in front of vanity cabinets(Mens), 1 new floor drain centered in front of shower(Womens) 1 new floor drain in mop room(No Charge) i SUBTOTAL $ 29,875.00 SALES TAX $ - TOTAL $ 29,875.00