PROFESSIONAL SERVICES AGREEMENT
CONTRACT AMENDMENT
CITY PROJECT NO. 8914
Cathedral City FEDERAL AID PROJECT NO.BHLS-5430(027)
DATE PALM DRIVE BRIDGE SPANNING THE WHITEWATER RIVER
CONSULTANT: RBF CONSULTING,INC.
Attention: Bradley R.Mielke,P.E.,S.E.
74-130 Country Club Drive,Suite 201
Palm Desert,CA 92260-1687
CONTRACT AMENDMENT NO.2
Pursuant to the terms of the original Professional Services Agreement, you are hereby directed to
make the herein described changes or do the following described work not included in the
original scope of work for this Contract. Unless otherwise stated all work shall conform to the
terms,general conditions,and special provisions of the Contract.
******************************************************************************
DESCRIPTION OF CHANGE
This contract amendment authorizes RBF Consulting, Inc. to prepare the plans, specifications and
engineer's estimate for the Coachella Valley Water District (CVWD) water line and sanitary
sewer line relocation for the Date Palm Drive Bridge Widening Improvement. RBF's additional
work request outlining the approved scope of work and fee, dated May 27, 2014, is attached and
made part of this contract amendment.
******************************************************************************
Previous Contract Amount Through Contract Amendment No. -1-: $1,266,508.00
Add/Deduct this Amendment: $34,500.00
Revised Contract Total: $1,301,008.00
The contract completion date for the engineering phase is not affected by this contract
amendment. Contract Amendment No. 1 extended the completion date through December
2021 to allow for the five year Mitigation, Monitoring and Reporting activity following the
completion of construction.
******************************************************************************
Approved . / / / Date: 7 L
******************************************************************************
We, the undersigned Consultant, have given careful consideration to the change proposed and
hereby agree, if this proposal is approved, that we will provide all equipment, furnish all
materials,perform all labor, except as may be noted above, and perform all services necessary to
complete the above speci red work, and hereby accept as full payment the amount shown above.
Accepted By: Title: 3244-4-;-1
Consultant: /e151"; 1 Date:
74-130 Country Club Drive,Suite 201
Palm Desert,CA 92260-1687
760.346.7481
M F 760.346.8315 Fax
CONSULTING www.rbf.com
A-Company www.mbakercorp.com
May 27,2014 JN: 130556
Mr. Bill Simons,PE
CITY OF CATHEDRAL CITY
68-700 Avenida Lalo Guerrero
Cathedral City,CA 92234
RE: Additional Work Request#2—Date Palm Drive Bridge Widening; City Project No. 8991
Federal Project Number: BHLS 5430 (027)
Dear Bill:
Please find the attached proposed scope and fee for the design work related to CV WD water line
relocation for the Date Palm Drive Bridge Widening project.
We look forward to continuing to assist the City with this important project and if you have
questions or comments,please contact me at your earliest convenience.
Respectfully submitted,
Bradley R.Mielke,PE,SE
Senior Vice President
Structural Engineering
H:\pdata\130556\Admin\Contract\Cover Letter for AWR#2.docx
. ■
Mr.Bill Simons
May 28,2014
Page 2
SCOPE OF WORK—ADDITIONAL WORK REQUEST #2
Task 1: Water Relocation Plan
RBF shall prepare a plan for the relocation of the existing domestic water main at the eastside of
Date Palm Drive to the Whitewater Channel. The plan will show the relocation of approximately
1,900 lineal feet of 18"water main to accommodate the street and bridge widening. The water
main relocation plan will be designed in plan and profile at a scale of 1"=40' in accordance with
CVWD standards and requirements. It is assumed that the water main relocation plans will be
standalone plan set. The plans shall include the following:
• Title sheet
• Three(3)plan and profile sheets prepared at a scale of 1"=40' horizontal and 1"=4'
vertical.
• Two (2)detail sheets,which will include notes and pipe attachments to bridge girders,
piers, and deck.
This task will also include coordination with CVWD staff during the design and processing of the
plans.
Task 2: Sewer Relocation Plan
RBF shall prepare a plan for the relocation of the sewer main at the northern Date Palm Drive
approach to the Whitewater Channel. The plan will show the relocation of approximately 95 lineal
feet of sewer main away from a proposed bridge abutment along the northeast limits of the bridge
approach. The relocation of sewer main will require the construction of one additional manhole
and 80 lineal feet of 24"sewer main. The sewer main relocation plan will be designed in plan and
profile at a scale of 1"=40' in accordance with CVWD standards and requirements. This task will
also include the development of a sheet detailing the raising of the existing manholes in the area of
the street grade changes. It is assumed that the sewer main relocation plans will be standalone plan
set. The plans shall include the following:
• Title sheet
• One(1)plan and profile sheets prepared at a scale of 1"=40' horizontal and 1"=4'
vertical.
This task will also include coordination with CVWD staff during the design and processing of the
plans.
Mr.Bill Simons
May 28,2014
Page 3
COMPENSATION
City agrees to compensate RBF for such services as follows and in accordance with the original
agreement provisions:
Task Fee
1 Water Relocation Plan $28,000.
2 Sewer Relocation Plan $6,500.
Total Fee= $34,500.