Loading...
HomeMy WebLinkAboutContract - 03/21/2024 - 2081 44Kreri, COACHELLA VALLEY \NATER DISTRICT Established in 7918 as a public agency GEN ERA L MANAGER A SS I S TA NI GENERAL MA[LAGER Barrett Robert Ch en q CLERK OF THE BOARD A SSI STA NT GENERA I AAA HAGER Sylvia B effriLid Charlton March 28, 2024 CERTIFIED MAIL—ARTICLE NO. 7019 2970 0000 9097 2271 Charles McClendon City Manager City of Cathedral City 68700 Avenue Lalo Guerrero Cathedral City CA 92234-7031 Dear Mr. McClendon: Subject: Reimbursement AD:pement for Panorama Neighborhood Pavement Reconstruction Enclosed please find a signed copy of the Reimbursement Agreement for the Panorama Neighborhood Pavement Reconstruction, Horizon Road CIP (C08676), Los Gatos Road CIP (C08677), Panorama Road CIP (C08678, East-West Alley CT (C08679), North-South Alley CIP (C08680). Please execute the Agreement and return a copy by email to Tyler Hull, Utility Coordinator, at thull@cvwd.org. If you have any questions or require additional information, please contact Tyler Hull, Utility Coordinator, at (760) 398-2661, extension 2571. Sincerely, Tommy Vwlkes Development Services Supervisor Enclosures/l/as TH:al\Eng\Dev Srvs\20241Mar\Panorama Reimbursment.doc File:0001.3,0437.1, 1150.13 Coachella Valley Water District . P.O. Box 1058 Coachella, CA 92236 www.cvwd.orq Phone (760) 398-2651 Fax(760) 398-3711 an Equal Opportunity Employer DocuSign Envelope ID:C65A9FFO-A5FA-4796-94D7-67D64502284B <114A-ref4P C AChELLA VALLEY ATER 1ST ICI Established in 1918 as a public agency 461/4/ 0-S, ST Rt • • GENC RAL MANACER ASSISTANT(;FNI RAI MANAG-11 Jeto bboirtiL Robert Ong r 1 IrRKP OANP ASSIGIANI GLN N 'YO:a CRJR.orl March 21, 2024 Charles McClendon City Manager City of Cathedral City 68700 Avenue Lalo Guerrero Cathedral City CA 92234-7031 Dear Mr. McClendon: Subject: Reimbursement Agreement for Panorama Neighborhood Pavement Reconstruction, Horizon Road CIP (C08676), Los Gatos Road CIP (C08677), Panorama Road CIP (C08678. East-West Allen CIP (C0867 , North-South Alle CIP (C08680) The City of Cathedral City("City") intends to construct a project commonly referred to as the Panorama Neighborhood Pavement Reconstruction, Horizon Road CIP (C08676), Los Gatos Road CIP (C08677), Panorama Road CIP (C08678, East-West Alley CIP (C08679), North- South Alley CIP (C08680) (Project). Coachella Valley Water District("CVWD") has certain facilities which will be affected by the Project, including approximately nine-teen (19) water valves and seven (7) sewer manhole covers and one (1) sewer cleanouts ("CVWD The Project will require: (i) the CVWD Facilities to be lowered so the City may cold mill, or cause to be cold milled, the existing asphalt street(s), (ii)the City to install, or cause to be installed, new asphalt in the street(s) and (iii) raise or cause the CVWD Facilities to be raised to grade. CVWD is responsible for items(i) and (iii)above (-CVWD Portion of the Project"). City has offered to cause City's contractor("Contractor") to complete the CVWD Portion of the Project in exchange for the payment provided herein. City shall prepare, or cause to be prepared, construction plans and specifications ("Plans") for the Project, including the CVWD Portion of the Project. The CVWD Portion of the Project shall be completed in accordance with CVWD's design criteria and standards, including but not limited to, CVWD's Development Design Manual. City shall provide CVWD the opportunity to review and approve the Plans, which approval shall not be unreasonably withheld. City shall cause the Contractor to complete the CVWD Portion of the Project in accordance with the approved Plans and CVWD Standards. Coachella Valley Water District attUMWZMV,i. , P.O.Box 1058 Coachella, CA 92236 www.cvwd.org Phone(760)398-2651 Fax(760)398-3711 an Equal Opportunity Employer DocuSign Envelope ID:C65A9FFO-A5FA-4796-94D7-67D64502284B Charles McClendon City of Cathedral City March 21, 2024 Page 2 CVWD shall have the right to (i) inspect the installation of the CVWD Portion of the Project, and(ii)enforce the Plans and Standards for the CVWD Portion of the Project, including requiring that all unacceptable material, workmanship and/or installation be repaired, replaced or corrected by the Contractor. Upon completion of the Project, CVWD shall have the right to complete a final inspection of the CVWD Portion of the Project and provide notice to City either confirming that the CVWD Portion of the Project is complete or setting forth a punch list of items that need to be completed or corrected. CVWD shall receive the same benefit as the City in its contract with the Contractor as to insurance, indemnities, bonds, warranties,etc.,as such applies to the CVWD Portion of the Project. Upon completion and acceptance of the CVWD Portion of the Project by CVWD, CVWD shall remit to City the sum of Thirty-Eight Thousand Three Hundred and Forty Dollars($38,340.00) in full payment for the planning, design and construction of the CVWD Portion of the Project. This payment is an estimate based off the bid alternate and total number of CVWD Facilities adjusted within the Project. COACHELLA VALLEY WATER DISTRICT, a public agency of the State of California [DoeuSigned by: By: EF25411F0435436... J. M. Barrett General Manager CITY HAS READ THE FOREGOING LETTER AND ACCEPTS THE TERMS SET FORTH THEREIN. CITY OF CATHEDRAL CITY, a municipal corporation TH:al\Eng\ROW12024\Marc\CC Reimbursement Agreement Panorama File:0437.1,0001.3,1150.13 Coachella Valley Water District „ , It% vatviestasom% .,", : PM. Box 1058 Coachella, CA 92236 www.cvwd.org Phone(760) 398-2651 Fax(760)398-3711 an Equal Opportunity Employer