1. Description of Changes in Work,Materials and/or Equipment Installed. Pursuant to the terms and conditions
of the Agreement dated -1- i l , Customer authorizes and requests the change(s) in the Work specified below.
The Agreement and/or scope of work is hereby changed as follows(continue on separate sheets, if necessary):
CA-C/A(1 t c e v\4�( ,? 5-E-vCLvA L';ir t� c�vr.\t i s)
� to a -N (1.►.►n c r i C {OD rVi, t-kk Q.v1 ; (Nut C 6 c€'V, S.
J
2. List of Documents Incorporated into this Change Order:
l 3 -05R-1 - 5 rr?-- CO
3. Change in Contract Price. As a result of the changes described above, the amount payable to Contractor is
hereby modified as follows. This Change Order shall:
' Increase the cost of the work by $ 3
❑ Decrease the cost of the work by $
Total Revised Contract Price: $ Z 2. . 5`,, 2;7
4. Progress Payments. Changes, if any, in progress payments: ❑None;El.p follows:
q/...0 . (2- vin,ry s t cr.tvtC) C(GU/tCr 6YA •
5. Completion. As a result of the changes described above, the approximate days for substantial completion of the
Work is hereby modified as follows(if applicable):
6. Note About Extra Work and Change Orders: Extra Work and Change Orders become part of the contract once
the order is prepared in writing and signed by the parties prior to the commencement of any work covered by the new
change order. The order must describe the scope of the extra work or change,the cost to be added or subtracted from the
contract,and the effect the order will have on the schedule of any progress payments.
7. Terms. This Change Order supersedes any contrary terms and provisions in prior agreements. All other
applicable terms and conditions of the written agreements between the parties shall be unaltered by this Change Order and
shall remain in full force and effect.
I HAVE READ THIS CHANGE ORDER AND I UNDERSTAND IT. I ALSO UNDERSTAND I AM
ENTITLED TO A COMPLETELY FILLED-IN COPY OF THIS CHANGE ORDER, SIGNED BY
BOTH ME AND THE CONTRACTOR,BEFORE CHANGE ORDER WORK MAY BE STARTED.
"Cust mer(s)" - E Q CTOR• AA
Signature. Check one: IQr stomer;El Customer's Agent magna ure
et,(re& J . U t (cis .L zi 1M
Print Name and Title / Print Name,and Job Title utett
Drctifor
o• ' Daniel's DKJ
Corporate Office
73950 Dinah Shore Dr.Ste 302
Palm Desert,CA.92211
(760)320-2128(760)324-1714
Client: City of Cathedral City Home: (760)770-0340
Property: 68510 E.Palm Canyon Drive
Cathedral City,CA 92234
Operator Info:
Operator: DANIEL
Estimator: Daniel M.Eads Cellular: . (760)835-1858
Position: Estimator/PM E-mail: daniel@danielsdki.com
Company: Daniel's DKI
Type of Estimate:
Date Entered: 6/27/2013 Date Assigned: 6/3/2013
Date Est.Completed: 6/27/2013 Date Job Completed:
Price List: CAPP7X_JUN 13
Labor Efficiency: Restoration/Service/Remodel
Estimate: 13-0581-STR-CO 1
CHANGE ORDER#1 -ESTIMATE FOR CLEANING
-CHARGES ORIGINALLY SUBMITTED FOR CLEANING HAVE BEEN APPLIED AS A CREDIT TO ALLOW
FOR DIFFERENCE IN COST.
ISlikitial -=-1
Daniel's Dki DANIEL'S
73950 Dinah Shore Drive,Suite 302 a Job #: _ — i t;: :� ,;;
Palm Desert,CA 92211 ''
Tel: 760-320-2128 License#581149 �wiaTER� Date: C- t'4' / 1 -; / J
WORK AUTHORIZATION - COMMERCIAL
Customer(s): — r 1- C ; ti's'„', '. ., .1 i r
Date of Loss: / /
Property ii
Address: ic.9c 1 as L 1-0.1 w, (&.,,.y co. t k v4 City/State/Zip: 1' t :i, , , i C , • .R . �!
t
Customer hereby engages Daniel's DKI ("Contractor") to perform the work set forth below: to address damage caused by
❑Wind; ❑Fire/Smoke; ['Water; ]Mold; ❑Accident; ❑Other: which occurred on the
_date of loss stated above("the Event")or; ❑Remodel/Renovation;
1. Contract Documents: The list of documents attached and hereby incorporated into the contract isX Terms and Conditions;
]Estimate; ['National Rate Schedule; and Customer acknowledges receipt of the following disclosures:
❑Notice to Owner of Mechanics Lien Rights; ❑Mold Notice; ❑EPA Renovate Right Lead Notice; and
Other: .
2. Scope of Work: A description of the project and description of the significant materials to be used and equipment to be
installed is as follows: Customer hereby authorizes and directs Contractor to furnish all labor,equipment and material to perform work
at the Property as generally described below(the"Work"),or in the attached Estimate dated: / / .
]Emergency Services ❑Reconstruction ❑Restoration and Cleaning of Contents ❑ Packing and Storage of Contents
❑Remodel/Renovation andcOther IN\c1);) IL./VV,! < i;,-\
Affected areas i.. 1 : l r (E e ' ( c ` ( . - , l'\, P , . . : ' , : ,, (-A L\..; :,.1_: I- ;
Daniel's DKI � 1� _.r_
Job#: ,�; _ �-
DANIEL S
.7395 Dinah Shore Drive,Suite 302 v t
Palm Desert,CA 92211 -
Te1:760-320-2128 WATER Date: !j (- 1 7 -
License#581 149
TERMS AND CONDITIONS - COMMERCIAL
T ; s.: Cr;I•V A,/•'�1 C F'S 10 L C. \ (irl !'J� �i(,
Customer(s): I J Property Address:
ct. .Y�. C �} c .A-02734
1. Release for Third Party Professionals; Indemnity: If the property has sustained significant water damage, Customer
is advised to retain the services of independent environmental consultant to inspect, and if appropriate, prepare remedial protocols.
Customer shall indemnify and I)oJd Contractor harmless for injury or damage arising from or related to: (a) Customer's failure to hire
environmental consultants or'design professionals;or(b).the errors ix-omissions of any such third party professional.
2. Personal Liability: Payment to Contractor is not contingent upon Contractor's invoice being fully or partially approved
by Customer's insurance company. All charges shall be invoiced directly to Customer. Contractor will submit a copy of the invoice
to Customer's insurance carrier(s) as a courtesy only. Customer has been informed of, and agrees: a) Customer is personally
responsible for any and all deductible(s), depreciation, and charges not paid by insurance; and b) Invoices not paid by insurance are
due within fifteen(15)days of the invoice date.
3. Down Payment and Schedule of Progress Payments: The schedule of progress payments must
specifically describe each phase of work, including the type and amount of work or services scheduled to
be supplied in each phase, along with the amount of each proposed progress payment.
Amount
Description of Phase Payable Description of Phase Description
)s c. r;E c $ to23R5
—
$
4. Payment: Contractor will invoice Customer, describing the work performed and the charges. Payment is due fifteen
(15) days of the invoice date, unless the table of Progress Payments above is completed, in which case payment will be due as set
forth in the table. Contractor has the right, in Contractor's sole discretion, to suspend Work until past due invoices are paid. In
addition to the Finance Charges set forth below, Customer agrees to pay Administration Fees of one and one-half percent(1.5%)per
month on any unpaid balance after thirty(30)days of the invoice date,plus all actual collection costs, collection agency commissions,
actual attorneys' fees,expert fees,and court costs.
5. Finance Charges: Customer will pay interest at the rate of ten percent(10%)per year on any unpaid balance after thirty
(30)days of the date of invoice(interest is separate from,and in addition to the Administration Fees set forth above).
6. Partial Lien Releases: 9pon satisfactory payment being made for any portion of the work performed, Contractor shall,
prior to any further payment being made, furnish to Customer a full and unconditionaFrelease from any claim or mechanic's lien for
that portion of the work for which payment has been made.
7. Extra Work and Change Orders: Extra Work and Change Orders become part of the contract once the order is
prepared in writing and signed by the parties prior to commencement of work covered by the new Change Order. A Change Order is
not enforceable against the Customer unless it describes the scope of the extra work or change,the cost to be added or subtracted from
the contract, and the effect the order will have on the schedule of progress payments and completion date. However, by California
law,the contractor's failure to comply with these requirements does not prevent the contractor from the recovery of compensation for
the reasonable value of change order work in the absence of a written change order. Customer agrees to execute Change Orders to
increase the price to address conditions not reasonably anticipated by Contractor.
8. Limit of Liability and Indemnity: Contractor is not liable for claims arising from acts of Customer or Customer's
agents. Contractor's liability is limited to an amount equal to two times the Contract Price. All claims in excess of this amount are
wai ed. Customer shall pay for the defense and indemnify Contractor for all third party claims against Contractor that are not the
result of the sole negligence of Contractor. Contractor will select counsel of its choice and control the litigation. Commercial
General Liability Insurance (CGL): Contractor carries commercial general liability insurance written by
Westchester Surplus Lines Insurance Company. Tel. 760-360-4700. You may call to check the contractor's
insurance coverage.
9.Workers Compensation Insurance: Contractor carries workers' compensation insiirarrceTarall employees.
CONTRACTOR INITIALS: ;CUSTOMER INITIALS:
D._SEA Daniel's DKI
Corporate Office
73950 Dinah Shore Dr.Ste 302
Palm Desert,CA.92211
(760)320-2128(760)324-1714
13-0581-STR-CO1
SKETCH2
Main Level
Janitors Closet Height:8'
Door 2'6" X 6'8" Opens into IMAX_HALLWAY
Door 3'X 6'8" Opens into Exterior
DESCRIPTION QNTY UNIT COST TOTAL
11. Final cleaning-construction-Commercial 71.78 SF @ -0.14= -10.05
Imax Hallway Height:8'
Missing Wall-Goes to Floor 5'X 6'8" Opens into Exterior
Door 2'6"X 6'8" Opens into JANITORS_CLO
Door 2'6"X 6'8" Opens into Exterior
Door 2'6" X 6'8" Opens into Exterior
DESCRIPTION QNTY UNIT COST TOTAL
20. Final cleaning-construction-Commercial 86.11 SF @ -0.14= -12.06
Hallway Height:8'
Door 3'X 6'8" Opens into STORAGE_ROOM
Missing Wall 4'4" X 8' Opens into LOBBY
Door 3'X 6'8" Opens into OFFICE
Door 3'X 6'8" Opens into MENS_RESTROO
Door 2'6" X 6'8" Opens into WOMENS_RESTR
Door 3'X 6'8" Opens into Exterior
DESCRIPTION QNTY UNIT COST TOTAL
33. Final cleaning-construction-Commercial 134.05 SF @ -0.14= -18.77
34. Cleanfoor-tle 134.05 SF @ 0.60= 80.43
Lobby Height:8'
Missing Wall 18'3"X 8' Opens into Exterior
13-0581-STR-CO1 9/25/2013 Page:2
0 f M E L'f Daniel's Dill
Corporate Office
73950 Dinah Shore Dr. Ste 302
Palm Desert,CA.9221 1
(760)320-2128(760)324-1714
Door 3'X 6'8" Opens into KITCHEN
Missing Wall 4'4" X 8' Opens into HALLWAY
DESCRIPTION QNTY UNIT COST TOTAL
-0.14= -15.99 @ w
44. Final cleaning-construction-Commercial 114.20 SF
45. Clean floor-tile 114.20 SF @ 0.60= 68.52
Storage Room Height:8'
Door 3'X 6'8" Opens into HALLWAY .
DESCRIPTION QNTY UNIT COST TOTAL
SF
55. Final cleaning-construction-Commercial 109.24 @ -0.14= -15.29
56. Clean floor-tile 109.24 SF @ 0.60= 65.54
Office Height:8'
Door 3'X 6' 8" Opens into HALLWAY
DESCRIPTION QNTY UNIT COST TOTAL
67. Final cleaning-construction-Commercial 49.33 SF @ -0.14= -6.91
69. Clean floor-tile 49.33 SF @ 0.60= 29.60
Mens Restroom Height:8'
Door 3'X 6'8" Opens into HALLWAY
DESCRIPTION QNTY UNIT COST TOTAL
93. Final cleaning-construction-Commercial 94.00 SF @ -0.14= -13.16
94. Clean floor-tile 94.00 SF @ 0.60= 56.40
Kitchen Height:8'
Missing Wall 11'1 1/2" X 8' Opens into Exterior
Door 3' X 6'8" Opens into LOBBY
Subroom: Kitchen Offset(I) Height:8'
13-0581-STR-001 9/25/2013 Page:3
N i E t'S Daniels DKI
Au Corporate Office
73950 Dinah Shore Dr.Ste 302
Palm Desert,CA.9221 I
(760)320-2128(760)324-1714
Missing Wall
4'X 8' Opens into KITCHEN
Subroom: Closet(2) Height:8'
Door
2' 1" X 6'8" Opens into KITCHEN
DESCRIPTION QNTY UNIT COST TOTAL
107. Final cleaning-construction-Commercial 204.13 SF @ -0.14= -28.58
108. Clean floor-tile
204.13 SF @ 0.60= 122.48
General Items
DESCRIPTION QNTY UNIT COST TOTAL
116. Cleaning of all areas throughout restaurant-Dining room- Kitchen 1.00 EA @ 2,484.00= 2,484.00
117. Clean floor-tile 1.00 SF @ 285.00= 285.00
118. Clean and deodorize carpet 1.00 SF @ 185.00= 185.00
Grand Total Areas:
2,869.64 SF Walls 955.57 SF Ceiling 3,825.21 SF Walls and Ceiling
955.57 SF Floor 106.17 SY Flooring 349.68 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 403.84 LF Ceil.Perimeter
955.57 Floor Area 1,072.83 Total Area 2,869.64 Interior Wall Area
1,218.03 Exterior Wall Area 173.30 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total}lip Length
•
13-0581-STR-CO1 9/25/2013 Page:4
E Daniel's DKI
Corporate Office
73950 Dinah Shore Dr. Ste 302
Palm Desert,CA.92211
(760)320-2128(760)324-1714
Summary for Structural Repairs
Line Item Total 3,256.16
Overhead 10.0%, 325.59
Profit ct 10.0% 325.59
Material Sales Tax C 8.000% 12.78
Replacement Cost Value $3,920.12
$
Net Claim $3,920.12
Daniel M. Eads
Estimator/PM