HomeMy WebLinkAboutCC Reso 2020-07 RESOLUTION NO. 2020- 07
RESOLUTION ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR
2020-21 FUNDED BY SB 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the
Governor in April 2017 to address the significant multi-modal transportation funding
shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure the residents of Cathedral City ("CITY") are aware of the projects proposed for
funding in our community and which projects have been completed each fiscal year; and
WHEREAS, the CITY must adopt by resolution a list of projects proposed to
receive fiscal year funding from the Road Maintenance and Rehabilitation Account
(RMRA), created by SB 1 , which must include a description and the location of each
proposed project, a proposed schedule for the project's completion, and the estimated
useful life of the improvement; and
WHEREAS, the CITY, will receive an estimated $900,000.00 in RMRA funding in
Fiscal Year 2020-21 from SB 1; and
WHEREAS, this is the fourth year in which the City is receiving SB 1 funding and
will enable the City to continue essential road maintenance and rehabilitation projects,
safety improvements, repairing and replacing aging bridges, and increasing access and
mobility options for the traveling public that would not have otherwise been possible
without SB 1; and
WHEREAS, the CITY has undergone a robust public process to ensure public
input into our community's transportation priorities/the project list; and
WHEREAS, the CITY used a Pavement Management System to develop the SB
1 project list to ensure revenues are being used on the most high-priority and cost-
effective projects that also meet the community's priorities for transportation investment;
and
WHEREAS, the funding from SB 1 will help the CITY maintain and rehabilitate
streets throughout the CITY this year and in the future; and
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs
Assessment found that the CITY's streets and roads are in a poor condition and this
revenue will help us increase the overall quality of our road system and over the next
decade will bring our streets and roads into a "good condition" condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and
roads infrastructure with a focus on basic maintenance and safety, investing in complete
ten (10) streets infrastructure, and using cutting-edge technology, materials and
practices, will have significant positive co-benefits statewide.
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City
Council of the City of Cathedral City, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The following proposed project will be funded in-part or solely with fiscal year 2020-
21 Road Maintenance and Rehabilitation Account revenues:
Proposed Project 1: Landau Boulevard and McCallum Way Intersection Traffic
Signal Construction
Description: The proposed Project will convert an existing four-way intersection
into a signalized intersection and concrete deceleration pads north and south
bound on Landau Boulevard. This intersection is located at the southwest corner
of Mt. San Jacinto High School, which gets significant pedestrian traffic from
students. This intersection was also the location of a 2015 pedestrian fatality.
Location: Intersection of Landau Boulevard and McCallum Way
Estimated Useful Life: Twenty (20) years
Project Start: Winter 2020
Project Completion: Winter 2020
Estimated Cost: $400,000.00
3. The following previously proposed and adopted project may utilize fiscal year
2020-21 Road Maintenance and Rehabilitation Account revenues in its delivery.
With the relisting of this project in the adopted fiscal year resolution, the City is
reaffirming to the public and the State our intent to fund this project with Road
Maintenance and Rehabilitation Account revenues:
Proposed Project 2: Whispering Palms Neighborhood Street Pavement Rehabilitation.
Description: The proposed project consists of five (5) residential streets requiring
asphalt reconstruction.
Location: Candlewood Drive, Shifting Sands Trail, Sky Blue Water Trail, Whispering
Palms Trail, Navajo Trail, and Pueblo Trail between Ramon Road and Avenue 33.
Project Start: Summer 2021
Project Completion: Fall 2021
Estimated Cost: $1,000,000.00
Estimated Useful Life: Twenty (2 0 ) years
PASSED AND ADOPTED by the City Council of the City of Cathedral City, State
of California this 25th day of March 2020, by the following vote:
Ayes: Councilmembers Lamb, Gutierrez and Carnevale; Mayor Pro
Tem Gregory and Mayor Aguilar
Noes: None
Absent: None
Abstain: None
(17 • _
Jon Aguilar, Mayor
ATTEST:
v ,1/1.&t,CW .VV irti(
Tracey R(.-Martinez, City Clerk ly
APPROVED AS TO FORM:
Eric S. Vail, City Attorney