HomeMy WebLinkAboutContract 1638-1 4,6342'4 ( 4 tip Scanned by - - File No. DPLX Contract Change Order No. 2 Total Pages: 3 plus attachments Ctht erdL CitLV/{' The Spbil of the Desert . City of Cathedral City 68-700 Avenida Lab Guerrero Cathedral City, CA 92234 AGENCY: City of Cathedral City PROJECT TITLE: Date Palm Lighted Crosswalks BID NO: B12-147E CITY PROJECT: No. 2012 TO: Sierra Pacific Electrical You are hereby directed to make the herein-described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by Cathedral City. r i AGENCY: City of Cathedral City - Contract Change Order No. 2 Date Palm Lighted Crosswalks Description of work done. (Quantities and prices shown on attached Request for Change Order.) Differentiate between additional work at contract price, agreed price and time and materials. DELETED WORK ITEMS: Delete the following Bid Items at Contract Price, in their entirety: NONE ADDED WORK ITEMS: Increase the Quantities at Contract Price for the following Bid items: NONE ADDED WORK ITEMS: Increase the Quantity at Adjusted Contract Price for the following Bid items: Bid Item 2-Temporary Traffic Control: Add LS @$2,750.00 Bid Item 6A-Curb Ramps: Add 7 EA @$3,685.00 = $25,795.00 Add Item-Cast in Place Truncated Domes: 144 SF @$33.00/SF = $4,752.00 Add Item- Safety Step Surface Applied Truncated Domes: 2 EA @ $418.00 = $836.00 Quantities and Unit Prices for Bid Items not specifically mentioned in this Contract Change Order remain in force. Estimated Cost: Decrease: $0.00 Increase: $34,133.00 By reason of this order the date of completion shall be adjusted as follows: Increased_ No Change X Days Contract Bid Amount: $231,374.00 Contract Time: 40 working days Total Previous Changes: $1,18300 Total Previous Changes: 0 This Change: $34,133.00 This Change: 0 Revised Contract Total: $266,690.00 Revised Contract Total: 40 ' . • -_ •..��,.ru.. L........u.., i....�aL.....e..u..:_.-..._..c..s.,Y..•.-+w.....v1«r.x_..m..c._u •,aiu:.:a..w..•r.._...... ..u......._.V Y. • Cl AGENCY: City of Cathedral City- Contract Change Order No. 2 Date Palm Lighted Crosswalks Reviewed and Accepted by : Bill Simons, P.E. City Engineer City: Signature City Engineer We, the undersigned contractor, have given careful consideration to the atchange proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted Date: - /1 �'f Contractor: Sierra Pacific Electrical By: �.Signature,}4L/ ��c Title: (/( 1(),/‘ If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time specified therein.