- - File No. DPLX
Contract Change Order No. 2
Total Pages: 3 plus attachments
Ctht erdL CitLV/{'
The Spbil of the Desert .
City of Cathedral City
68-700 Avenida Lab Guerrero
Cathedral City, CA 92234
AGENCY: City of Cathedral City
PROJECT TITLE: Date Palm Lighted Crosswalks
BID NO: B12-147E
CITY PROJECT: No. 2012
TO: Sierra Pacific Electrical
You are hereby directed to make the herein-described changes from the plans and
specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: This change order is not effective until approved by Cathedral City.
r i
AGENCY: City of Cathedral City - Contract Change Order No. 2
Date Palm Lighted Crosswalks
Description of work done. (Quantities and prices shown on attached Request for
Change Order.)
Differentiate between additional work at contract price, agreed price and time and
materials.
DELETED WORK ITEMS: Delete the following Bid Items at Contract Price, in
their entirety: NONE
ADDED WORK ITEMS: Increase the Quantities at Contract Price for the
following Bid items: NONE
ADDED WORK ITEMS: Increase the Quantity at Adjusted Contract Price for the
following Bid items:
Bid Item 2-Temporary Traffic Control: Add LS @$2,750.00
Bid Item 6A-Curb Ramps: Add 7 EA @$3,685.00 = $25,795.00
Add Item-Cast in Place Truncated Domes: 144 SF @$33.00/SF = $4,752.00
Add Item- Safety Step Surface Applied Truncated Domes: 2 EA @ $418.00 =
$836.00
Quantities and Unit Prices for Bid Items not specifically mentioned in this
Contract Change Order remain in force.
Estimated Cost:
Decrease: $0.00 Increase: $34,133.00
By reason of this order the date of
completion shall be adjusted as follows: Increased_ No Change X Days
Contract Bid Amount: $231,374.00 Contract Time: 40 working days
Total Previous Changes: $1,18300 Total Previous Changes: 0
This Change: $34,133.00 This Change: 0
Revised Contract Total: $266,690.00 Revised Contract Total: 40
' . • -_ •..��,.ru.. L........u.., i....�aL.....e..u..:_.-..._..c..s.,Y..•.-+w.....v1«r.x_..m..c._u •,aiu:.:a..w..•r.._...... ..u......._.V Y.
• Cl
AGENCY: City of Cathedral City- Contract Change Order No. 2
Date Palm Lighted Crosswalks
Reviewed and Accepted by : Bill Simons, P.E. City Engineer
City:
Signature City Engineer
We, the undersigned contractor, have given careful consideration to the atchange
proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all materials, except as may otherwise be noted above, and
perform all services necessary for the work above specified, and will accept as full
payment therefor the prices shown above.
Accepted Date: - /1 �'f Contractor: Sierra Pacific Electrical
By: �.Signature,}4L/ ��c Title: (/( 1(),/‘
If the Contractor does not sign acceptance of this order, his attention is directed to the
requirements of the specifications as to proceeding with the ordered work and filing a
written protest within the time specified therein.